Hiking between the raindrops |
So I'm prioritizing my piano. Which is fun and I'm paying for lessons so I should practice. And I'm trying to cut weight for the hiking trip, so cooking good food is a priority.
This is all leaving very little time for my other passions. And my studio is becoming hopelessly cluttered.
I'll start by saying I did spin 3+ ounces of chain plyed wool on the new e-wheel; too much fun!!! It's my first finished object of the year. I'd like to knit a cowl from it. (photo coming soon)
I'm currently working on
- Fabric from the paper yarn and a shirt from the fabric.
- The Sommerloch sweater (almost done).
- Spinning some goat for rugs.
What I need by March is a decorative neck band for my fleece and possibly a belt (tablet woven).
For the next knitting project, I plan on casting on a mobius shawl from the handspun. I'm also winding off yarn for a DanDoh poncho.
And I need a plan to unclutter the studio.
Other than that, the priorities are similar to before with some additions:
- Mosaics, probably stepping stones and the table. I'm also thinking about a sculpture and the pot with the cat.
- Dye something.
- Make 2 small rugs for the Lodge master.
- Beiderwand for the study group.
- Leno in linen
- Carve a stamp for some cards.
No comments:
Post a Comment