I'm heading out on a trip (where am I going? here's a hint)
and want to make a few notes on where I am on projects and what I want to be doing when I get back.I checked threading and wound the baby blankets on to the loom. There's one mistake that's marked and needs fixing. I need to check the denting in the reed (there are some empty slots, then I'm ready to tie up, tie on, and start weaving. This should go pretty fast at this point since the thing that was blocking me (big tangled ugly mess) is fixed.
Before I go to Ashland, I'd like to finish the poncho; that involves sewing the shoulder seams, then picking up and knitting on the edge. Current knitting project (T shirt) will be with me.
Before Ashland I'd also like to start the rose T shirt. That'll mean printing out the rose pattern and copying to something I can stencil with. Also getting a T pattern (I have the one from The School of Making), checking fit, cutting it out and stenciling. Also cutting the strips for the roses. This is probably 1/2 day of work.
I have the material and traced pattern for the french terry top, would be nice to start on that too; I think it'll go pretty fast.
I'd like to replace the top of the knitted skirt so I can start wearing it again. Maybe to Ashland.
And I need to start working on the table; I'd like to evaluate the glass I got from C. and finish prepping the substrate.

No comments:
Post a Comment